Abrishami, S, Goulding, J, Pour, R F and Ganah, A (2015) Virtual generative BIM workspace for maximising AEC conceptual design innovation: A paradigm of future opportunities. Construction Innovation, 15(01), 24-41.

Bonev, M, Wörösch, M and Hvam, L (2015) Utilizing platforms in industrialized construction: A case study of a precast manufacturer. Construction Innovation, 15(01), 84-106.

Duren, J V, Dorée, A and Voordijk, H (2015) Perceptions of success in performance-based procurement: Differences between clients and contractors. Construction Innovation, 15(01), 107-28.

Kähkönen, K and Rannisto, J (2015) Understanding fundamental and practical ingredients of construction project data management. Construction Innovation, 15(01), 7-23.

  • Type: Journal Article
  • Keywords: project management,team working,construction management,information systems/management,it building design and construction,planning and management
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/CI-04-2014-0026
  • Abstract:
    Purpose - This paper and research behind it aim to explain key elements behind construction project data management by looking at actual operations. The construction project management is heavily built around document control and relating events such as change orders, submittals, transmittals and requests for information. These functionalities are usually forming the core of electronic data/document management systems (EDMS), and more recently solutions based on Building Information Modelling (BIM) technologies. A growing share of buildings construction projects are designed and documented by using BIM applications. BIM applications can form spatially organised access to project data and documents which, if widely applied, can change the world of EDMS solutions. Design/methodology/approach - This paper presents results of a research effort where the use of EDMS was studied in 15 building construction case projects. The research focus was on EDMS structure, usage of EDMS in each case project and EDMS use models. Findings - The gained results explain content and characteristics of current practice. It is considered that useful knowledge can be learned from the present used of EDMS in building construction projects. This understanding can help our sector to move towards more advanced solutions. Research limitations/implications - The obtained research data are a certain kind of building development projects. These were renovation and change projects of existing buildings. Originality/value - Although the main stream of research has been technology-driven, the research behind this paper is targeting for new knowledge over the characteristics of EDMS use.

Moradi, S, Nasirzadeh, F and Golkhoo, F (2015) A hybrid SD-DES simulation approach to model construction projects. Construction Innovation, 15(01), 66-83.

Poirier, E, Staub-French, S and Forgues, D (2015) Embedded contexts of innovation: BIM adoption and implementation for a specialty contracting sme. Construction Innovation, 15(01), 42-65.

Wang, X and Chong, H-Y (2015) Setting new trends of integrated building information modelling for construction industry. Construction Innovation, 15(01), 6-18.